ODOT District 1 General Engineering Services
Various Locations, Ohio
American Structurepoint provided general engineering services on a task-order basis to ODOT District 1. Task orders included the following:
Industrial Park Sanitary and Water Service Evaluation and Design comparison of costs associated with supply of sanitary and water services for an industrial park, which included the preliminary layout for 3,040 feet of 12-inch water line, 1,420 feet of 6-inch water line, 1,660 feet of 12-inch sanitary sewer, 500 feet of 12-inch and 18-inch steel pipe encasement, eight fire hydrants, and a the design of a sewage pump station.
MAR-CR138-0.36 Court Testimony and Exhibits Court testimony and exhibits regarding parcels 1, 7, and 12 of the MAR-CR138-0.36 project.
MAR-423 Research for Court Testimony and Exhibits Research for court testimony and exhibits regarding the MAR-423 project.
Rest Area Water Treatment Improvements Improvements to the waste water treatment facilities at six different rest areas including replacing the chlorination and dechlorination system with ultraviolet light disinfection and post-aeration.
Lima Road Curb Cut Review Review of the impact of closing various curb cuts as a part of a road project for Lima Road in Lima, Ohio. This task required site visits to observe the existing traffic movements and access on-site, preparation of notes regarding the existing parking and drive configurations and layouts that was drafted to prepare exhibits showing the existing layouts for the sites, evaluation of each site with the respective curb cut removed, and preparation of exhibits showing two separate options on how the parking and drive aisles may be reconfigured. The reconfigurations had two main goals: to maintain the required parking, and provide similar, if not improved, internal circulation for each subject site. The task order also included preparation of an opinion of probable cost of construction for the proposed improvements and/or modifications that would be required for each option.
ALL-Vine Street Plan Review Review of plans for the design of the ALL-Vine Street Railroad Grade Separation project. This work included design review of a railroad bridge structure, storm sewer in the "sump" area, pump station, and the detention basin.
News
- American Structurepoint Expands Services to Akron, Ohio
- Rick Conner Reflects on 50-Year Journey from Intern to CEO
- Announcement from CEO Rick Conner, PE, SE
- Interesting Tips for How to Protect Your Home or Business
- Roundabouts Improve Safety and Solve Complex Traffic Issues
- American Structurepoint’s Strategic Growth Is Being Recognized