I-275 at I-4 Downtown Tampa Interchange (DTI) Design-Build, FDOT District 7

Tampa, Florida

The I-275 at I-4 Downtown Tampa Interchange was a critical part of Tampa Bay Next. The project was crucial to improving regional connectivity, congestion relief, traffic flow, interstate mobility, and travel time reliability. The project included five new bridges, seven bridge widenings/modifications, four existing bridge coatings, and two existing bridge railing retrofits. American Structurepoint provided several innovative Alternative Technical Concepts (ATC) that improved the original project concept. Most notably, we proposed a way to avoid the complex widening of the existing Ramp NE Flyover by instead constructing a new flyover bridge to carry the I-275 SB to I-4 EB movement and dedicate the existing flyover to neighboring Ybor City movement.

Read More +
News