Union Township Waterline Installation Program

Union Township, Ohio

The US 40 and SR 37 corridors in Union Township are well-positioned to capture growth. However, for these corridors to reach their potential, water service must be extended into these areas. There are also several existing businesses, including the National Trail Raceway, that are not connected into any system and are currently experiencing capacity challenges and fire suppression risks. To address these needs, the Southwest Licking Community Water and Sewer District (SWLCWSD) selected American Structurepoint to extend service into the Luray service area. The project involves installing nearly 30,000 lft of 8-, 12-, and 16-inch water mains. Our work began with surveying for water main alignment and necessary easement.

Read More +
News